The annual planning

Orion runs the annual planning with the organization's key people: each one answers, on the planning page, a few questions about what they want for the period, with Orion's comment on each answer, and, when whoever leads asks, Orion brings it all together into a synthesis: the cards, where people agree, where they diverge and the meeting's agenda.

Read in: Portuguese · Spanish · French

The synthesis shows on the page, for the key people, and whoever leads, if they are one of them, decides each card right there (see Deciding each card) and, once every card is accepted or set aside, starts the breakdown: the plan tree, each part's deliverables and each team's time (see The breakdown: the plan tree, The plan's deliverables and Each team's time, period by period) and, last, the approval of each part, the plenary and the recording in Y Managers (see The approval and the plenary and Recording the plan in Y Managers). The page belongs to the organization and is in Settings › Grouping › Plan next year. At the top, it says until when the interviews run, the method and who coordinates — and, for a plan that starts after January, when it runs (for example, Plan from August to December). Right below come the stages, one block each: Prepare, Year in review, Interviews, Synthesis and decision, Breakdown and Approval and plan. Each block says “Done”, “You are here”, “Next” or “Later”, and a stage already done opens again with a click. Then the Your next step card says what is up to you in the current stage, as coordinator, key person or someone outside the list, and brings the button for the action when there is one: open the interviews, invite who is missing, start or continue your interview, or start the breakdown. In the breakdown, it shows the four steps — Part owners, Deliverables, Indicators and Team time —, each with what is missing, and the title says the step that comes next; clicking a step scrolls down to its block.

Who starts and who leads

The Admin starts it. When preparing, the Admin chooses the year, the method, the key people and the interview deadline (15 days by default; at most 30, counting today), and can name one of them to lead; if no one is named, whoever prepares leads. Whoever leads adjusts the list and the questions, opens the interviews, reopens a finished interview and asks Orion for the synthesis. Without a subscription, these buttons show a 🔒. In the prepare stage, a band says the mode: review what already exists, with what Grouping has — the objectives, the initiatives and the open deliverables linked to them —, or start from scratch, when it has no objectives yet.

Prepare in six blocks

Prepare comes in six numbered blocks, in the order of the work: Method, Key people, The interview script, The core of the plan, Interview deadline and When the plan starts. Save sits in a bar fixed to the bottom of the page, with a summary of what it will save — how many key people and questions, the deadline and the method — and saves everything at once. With a change not yet saved, the bar says so and shows Discard the changes, which brings everything back to what is saved. In the deadline block, the reminders show as cards: the invitation (through Open the interviews in Year in review; with the interviews open, on each save, to whoever joined the list), the one for whoever hasn't started, the one for whoever stopped halfway and the deadline one, with its date, 2 days before.

When the plan starts

The plan runs from the month it starts to December. In the When the plan starts block, whoever prepares chooses the month: for next year, the planning suggests January; for the current year, the current month — a company that decides mid-year to have a plan plans the rest of the year, without waiting for January. The months before the start are outside the plan: the periods, the teams' time and the indicators' trajectory start there, and the Dashboard says the day the plan starts. The month is saved with the rest, on Save.

The method

There are five: CLEAR (the Y Managers method: three to five objectives, with a few initiatives each), OKR, BSC, Problem tree and Situational Strategic Planning (Matus). The method brings the interview questions — which whoever prepares can change — and sets the columns of the synthesis: the method's levels and the deliverables. The page shows the chosen one, with its summary; Use another method shows the list. Once the first person answers, it can't change anymore.

The key people and each one's area

People are chosen through the structure, team by team. Click a team and check its people, one by one or with Check the whole team. Managers only leaves just the team's managers in the list. Then move on to the next team. The search covers the whole organization, by name, title or team. Whoever is already chosen stays in the Chosen so far table, with their title, area, Leads and the interview in a chip — Joins when saved for whoever just joined the list. In the structure, each team's count turns green when the whole team is chosen, and manager marks whoever manages the team. The area comes from the team the person was checked in, and it can be changed (for example: Sales, Operations). Someone taken off the list, with Remove on their row, is out of the planning. If that person had already received the invitation, their interview is closed and they get a notice. What they already confirmed stays saved, shows up in the answers marked no longer a key person, and Orion uses it in the synthesis knowing it came from someone who left. If they were the last one left to finish, whoever leads gets, on save, the notice that the interviews are done. Once the synthesis exists, taking someone off the list asks for confirmation.

A person removed from the organization (deactivated in Users) leaves the progress count without anyone having to take them off the list: they stay in The interviews, with the No longer in the organization tag, don't count in the total or among those still missing, and what they said stays, with the same mark. Save doesn't take them off the list or notify them; if they are restored, they count again. If they were the last one left to finish, the notice that the interviews are done goes out within a day.

After the breakdown, someone who owns parts of the plan only leaves the list after handing them over: in place of Remove there is Hand the parts to… and the key person who takes them (the handed-over parts lose their approval, and the new owner is notified).

The interview script

The questions are in The interview script, in the prepare stage. They start as the method's questions, and each person sees them in their own language. Whoever prepares can change the text of each one, Add a question, Remove and reorder them with the arrows; from then on, the script applies as written, to everyone, in any language. There can be up to 20 questions, of up to 500 characters each, and Back to the method’s questions undoes the changes. The script can change while the interviews are open: a question whose text changes keeps its answers; one that is removed stops counting in the progress, and what was already answered to it stays saved and goes into the plan; a new question applies to those who haven't finished. The script is saved with the rest, with Save.

The core of the plan

The vision and the mission of the plan are optional. When they are written, the cards of the synthesis serve them, and Orion doesn't rewrite them. Left blank, Orion proposes a vision from the interviews when it builds the synthesis, for you to adjust. With the vision written, the block shows how it opens the breakdown map, in the dark band. The whole organization sees the core in the Prepare step.

The year in review

After the list is saved, the Year in review stage shows the year before the plan's: the deliverables — those due in the year and those that received hours —, by objective and initiative in Grouping (each row adds up everything below it) and by team. In each row: how many were completed — and, of those, how many on time and how many late —, how many were cancelled, how many are still open and the hours from the signed work plans; under Attention, how many depend on one person only (when that person did 80% or more of the hours) and how many are overdue and still open. Click a row to open, below the table, its deliverables: the team, the deadline — the planned one and the current one, when the deliverable was rescheduled —, the status and the hours. What wasn't under any objective shows up in Outside any objective. If Grouping has no objectives yet, the planning starts from scratch, and the year in review shows the year by team. The year in review is only for whoever leads and for the key people; in an organization that reads by team, the name and the deadline of another team's deliverable stay hidden, but it still counts in the numbers.

The invitation and the interview

In the year in review stage, the Open the interviews button, in Your next step, invites each key person: the notice arrives in the Waiting on you bell, by email and, if they have Orion on WhatsApp, there too, with the deadline and the link that opens the planning page right on the questions. Each reminder goes out only once: to whoever hasn't started, 3 days after the invitation; to whoever stopped halfway, after 3 days without answering; and to whoever hasn't finished, 2 days before the deadline. From that day on, only the deadline reminder goes out: no one gets two on the same day. Whoever leads is notified when someone finishes, when everyone has finished and when the deadline passes; if someone joins the list after everyone had finished, the everyone-finished notice goes out again when that person finishes. Someone added to the list later, while the interviews are open and before the deadline, is invited on Save itself, with the same notice; if the notice doesn't go out to someone, Invite who is missing, on the same card, tries again. After the deadline, someone added is only invited if the deadline is extended in the same save.

The interview is a form on the page itself, in Your interview: at the top, the Answered x of y questions bar; below it, the questions. The person writes the answer and clicks Send answer: the answer is saved as a draft, and Orion comments on what is clear and what is missing — why it matters, how we'll know it worked, by when and who takes care of it. Orion doesn't rewrite the answer, doesn't make things up and doesn't judge. The person adjusts the text if they want, and clicks Confirm; Ask for another comment sends it again. If the comment doesn't come, the answer stays saved and can be confirmed as it is. Doesn't apply marks a question that doesn't fit their area, and Change the answer reopens an answer already confirmed. Only confirmed answers and the ones that don't apply count in the bar. The comment uses the Y Managers AI, paid for by the organization; if the organization has no subscription, the person confirms directly, without the comment. You can dictate the answer: the 🎙 next to the field writes in it what you said, and you read it before sending.

They can stop and come back whenever they want, until the deadline: what was sent stays saved. The invitation link and the Start my interview button (or Continue my interview), in Your next step, lead to the questions. With all of them answered, Finish the interview closes the interview and notifies whoever coordinates.

When the interview closes, and how to reopen it

The interview stays open until the end of the deadline day. If whoever leads changes the deadline while the interviews are open, the interview of everyone who hasn't finished follows the new date, without a new message; extending a deadline that has passed reopens the interview of those who didn't finish. After the deadline, the questions become read-only, and what was confirmed stays saved and goes into the plan. A finished interview is read-only too. To change an answer after finishing, before the deadline, the person uses Reopen my interview, in Your interview or in Your next step. Whoever leads can also reopen anyone's interview, with Reopen the interview, on that person's row, in The interviews, and then the person gets a notice the same way as the invitation. The answers are still there: the person changes what they want and finishes again. After the interview phase, Your interview shows collapsed, in the Interviews stage and, for whoever is still answering, in the Synthesis and decision stage, with only the title and how many questions were answered: Show opens the questions and answers, and Hide closes them again. Continue my interview, in Your next step, opens the interview directly.

Who sees what

In The interviews, the page shows how many are complete, in progress, invited but not started, closed and not invited yet, a tag with each person's status and how many questions each one has answered. The key people see everything from each other, with the name of who brought it up: in The answers, as each person wrote them, each one's confirmed answers, by question or by person — drafts don't show up —, and the page tells this to whoever answers. The rest of the organization, including an Admin who isn't on the list, sees who takes part and where each one stands, but not the content.

The synthesis

Whenever they want, whoever leads asks Orion for the synthesis with the Ask Orion for the synthesis button, in the Synthesis and decision stage, or in the conversation — for example, "Build the synthesis of the 2027 planning". Whoever hasn't finished goes in with what they've confirmed so far. The synthesis does not close the interviews: whoever hasn't finished keeps answering until the deadline, and the stage bar shows Open until on the Interviews stage. Orion works in the background and tells whoever asked, in their conversation, how many cards the synthesis has, how many stayed vague and how many points went to the agenda. The synthesis comes out in the organization's language (the Language field on the Organization page), even if whoever leads uses another language in their own account. With new answers, Ask for a new version makes another version; with nothing new, Orion says the current synthesis already covers everything. With the button, the request goes straight to Orion, without opening the conversation: while it builds, the button shows Building the synthesis…, and the version shows in the Orion's synthesis block when it's ready. If building doesn't finish, the block says so, and Try again asks once more.

Orion builds the cards from the answers: it splits the ideas in each answer, joins similar ones from different people, gives each a size — a level of the method, a deliverable or still vague —, proposes where it goes and compares it with the previous year's plan. Each field holds only what someone said; what nobody said shows as Missing: nobody said. Before saving, the server checks that each card cites real answers, that each link respects the method's levels and that every answer became a card or shows up in Answers that did not become a card, with the reason.

In From the answers to the cards, the map has a column for each level of the method and one for the deliverables. The dashed line links each card to the one above: it is the link proposed by Orion, to be checked. The solid line is the one whoever leads chose or confirmed. A card without a link stays in its column, with a dashed border, and loose answers stay in Still vague, each with a concrete proposal from Orion or a question for whoever said it. Click a card to see who wrote it and the fields: why it matters; how to know it worked, with the indicator, the unit, today's number, the target and the formula — marked proposed by Orion, to be checked when nobody said it —; for deliverables, when they are done; by when; and who takes part. The open card also shows Where it came from, with each person's words, what the previous year's plan shows (for example, In the 2026 plan, in a 2027 planning) and Where it goes.

Below the map are Where they agree (each theme, with how many people brought it up), Where they diverge (each side, with the person and their position), The agenda of the decision meeting (each question with its label: Orion's proposal, New, Keep and adjust, Close or Divergence) and What Orion read in the interviews, the summary for the meeting. The key people decide, in the meeting; the cards whoever leads took to the meeting go at the end of the agenda.

The synthesis shows what each key person said, so only the key people see it, including whoever leads, if they are on the list. An Admin who leads without being on the list sees that it is ready, but not the content; the rest of the organization doesn't see it. A draft made before the synthesis by cards shows only its summary, as The previous version of the draft.

Deciding each card

Whoever leads, if they are on the list of key people, decides each card under You decide, below the open card. Each change is saved right away and shows up for the key people:

  • Accept into the plan: the card goes to the breakdown map, the next stage, and still goes through approval, in the last one;
  • Take to the meeting: the card goes at the end of The agenda of the decision meeting, as Decide the card “…”, and only goes to the map if the meeting decides so — what it decided is recorded on the agenda itself (see The decision meeting);
  • Set aside: the card stays out of the plan, but is kept with who brought it and the reason — It's for another period, It's already in another card or Not a priority now —, and it can be brought back;
  • Back to “no decision” undoes the decision.

Before deciding, you can adjust the Title (Orion's stays recorded on the card, and Back to Orion's title brings it back), the Size and Where it goes: only the cards of the level the method accepts above show up, Confirm this link makes the line Orion proposed solid, and Remove the link leaves the card without a link. Merge with another card is for two cards that say the same thing: the chosen one stays, the words of whoever brought each one add up under Where it came from, whatever was linked to the other moves to it, and the other leaves the map and shows up under Merged here, with Separate to undo it. Only cards of the same size merge; a still vague card merges with any card. On the map, each decided card gets a badge — In the plan, On the agenda or Set aside —, and the open card says who decided and when.

Decisions are tied to the version of the synthesis. A new version starts with no decisions, because its cards are different; the decisions of the previous one stay saved with it, and the page warns you before you ask for the new version. The other key people see the decisions and who made them, but don't change anything. Whoever leads without being on the list doesn't see the synthesis, so they don't decide. Without a subscription, the buttons under You decide show a 🔒.

The decision meeting

In The agenda of the decision meeting, under each item, is what the meeting decided: Decided or Postponed, the meeting date, the text and who recorded it. At the top of the agenda, a line with a bar shows how many items were decided, how many were postponed and how many are not recorded.

Whoever leads, if on the list of key people, records each item. On an agenda question, Record what the meeting decided opens the field What the meeting decided, the choice Outcome — Decided or Postponed — and the date in Meeting on, which already comes with the date of the last record or, on the first one, today's date; Save the record saves it. Decided needs the text; postponed doesn't. On a recorded item, Change opens the record again, and Back to «not recorded» deletes the record of that item.

A card taken to the meeting is decided right there, with the date in Meeting on and, if you want, the text in What the meeting decided (optional): Accept into the plan, Set aside, with the reason — It's for another period, It's already in another card or Not a priority now —, or Postpone to another meeting; Open the card shows the card in the panel next to the map. The decision is recorded as taken in the meeting, and the card gets its badge on the map. A postponed card stays taken to the meeting and holds the breakdown, which only starts when every card has been accepted or set aside. Back to «not recorded» on a card returns it to taken to the meeting.

The other key people see each item's record, with the name of who recorded it, and don't change anything. The record is tied to the version of the synthesis: a new version starts with no record, and the previous one's stays saved with it. Without a subscription, the buttons that save the record show a 🔒.

The board in Miro. At the top of the agenda, the Miro strip takes the synthesis to a Miro board, for the meeting's workshop. Only the person who leads, if they are on the list of key people, takes it to Miro, and with their own Miro account — in Connect Miro, right there, or in Orion → Integrations. Take to Miro opens the confirmation: what goes to the board — the map of the cards in columns by the method's levels and the deliverables, with the still vague ones apart; the decision meeting's agenda, with the cards taken to the meeting; Where they agree and Where they diverge, with the name of who said it —, where it is created and who sees the board. What Orion read in the interviews does not go. Once confirmed, the strip says Building the board in Miro…, and the link appears in Open the board in Miro when the board is ready, in a frame with the number and date of the synthesis version.

A new version. When there is a new version of the synthesis, the strip offers to take it to Miro: it goes in a new frame, on the same board, next to the previous one — nothing the workshop did is erased. If Miro's daily usage limit runs out midway, the board is half built, and Try again continues the same board.

Who sees the board. The board is created in the Miro account of the person who leads, and who gets in is decided in Miro. On the board, the synthesis shows what each key person said, with the name of who said it: everyone the board is shared with sees that, even people who aren't key people. The other key people see on the strip the board's link and the name of who has it, to ask for access. If the person who leads changes, the link stays until the new person takes the synthesis to their own Miro: then a new board is created, in their account.

Bring from Miro. After the workshop, the person who leads brings back what changed on the board with Bring from Miro, on the same strip. Orion reads the board's frames and comments and shows a review — nothing changes in the plan until the confirmation. The New notes go into the next version of the synthesis as meeting notes, with no name, because Miro doesn't say who wrote a note; each one comes with the column it is in and the cards it was linked to, and a copy of a card, with the same text, doesn't count as a new note. The Comments go in with the name of who wrote them and the card they were made on; someone who isn't a key person shows as a board guest. The Changed cards — a changed title, a card moved to another column, a link drawn or deleted — come back as suggestions: Apply the suggestion changes the card in this version of the synthesis, as an adjustment by the person who leads, and Ignore leaves the card as it is. For a link, the arrow doesn't decide which card goes on top: the method's level does.

Confirming what comes back. Each note and each comment can be left out. Confirm reads the board again and applies only what didn't change since the review; what changed in between waits for the next Bring from Miro. What was already decided doesn't come back in the next reading, and a note someone changes later comes back. Bringing doesn't create a new version of the synthesis: the notes and the comments go in when the person who leads asks for the next version. Until then, they are listed in the Orion's synthesis block, under From the Miro board, not in this version yet, just above Ask for a new version: each one with who said it and where it was on the board. The list empties when the new version includes them. They also show in The answers, as each person wrote them, in the Interviews stage — the note as “Meeting (Miro board)”.

The breakdown: the plan tree

The breakdown starts once every synthesis card is accepted or set aside, and every vague card that was accepted has a size. A card taken to the meeting is still waiting: after the meeting, it is accepted or set aside. The panel next to the map counts the cards with no decision and the ones on the meeting agenda. Before the start, the Breakdown step in the step bar already opens and, like the end of the synthesis, shows what is still missing, card by card, each with Open the card, which goes back to the synthesis with that card open to decide it. With everything decided, whoever leads, if they're on the key people list, clicks Start the breakdown, there or in Your next step. The plan tree grows from the accepted cards, and from then on the synthesis decisions no longer change.

How the tree grows. Each accepted card becomes a part of the plan at its level in the method (in CLEAR, objective or initiative), linked to the part above that was decided in the synthesis. The card's indicator becomes the part's indicator, with today's number and the target when what was said is a number; when it isn't (for example, «below 10»), what was said stays on record, and the page shows it next to the field. The card's Who becomes the owner when it's the name of a key person. A deliverable card becomes a proposed deliverable. A card that matches something from the previous year makes the part continue what is already in the Grouping: recording the plan updates that part instead of creating another, and its open deliverables come in as deliverables that already exist.

The four blocks. In this stage, each step has its own block, with the same number as in Your next step: 1, the plan's map; 2, The plan's deliverables, with Add a deliverable to the plan right after the map and the list below it; 3, The plan's indicators; and 4, Each team's time, period by period (with the default rhythm, quarter by quarter). What stayed out of the plan comes in a separate card, at the end, and Undo sits above the blocks.

What stays out. What is in the Grouping and no accepted card brought shows under Left out of the plan, with each part's open deliverables. Those parts stay active and untouched: recording the plan neither deletes nor deactivates anything. To deactivate one, on purpose, use the Grouping page.

The map and the list. The vision from Prepare sits at the top, in a dark band. Each top-level part takes a band, a row of its own: on the left, the part; on the right, what is below it — the parts one level down, each in a card of another color, with its deliverables — or, with no level below, the part's own deliverables. Deliverables are white, and the legend below the map gives the levels' colors and the tags. In each band, whoever can change the part has + Add and the name of the level below — in CLEAR, + Add initiative —, which creates the part right there, with just its name. Each part shows its owner and its first indicator, today → target; what is missing shows in orange. For whoever can change the part, No owner · choose opens the part with the cursor on the owner, and No indicator · add opens the part with a new indicator, ready to fill in, starting with what is measured. A part that continues the Grouping carries the tag Continues from and the previous year. Each deliverable carries a tag saying where it came from — Existing (in Y Managers), Proposed (came from the interviews, from Orion or a key person) or New (created in the plan) —, explained in the legend below the map; clicking a deliverable opens it below the map (see The plan's deliverables). In a part that takes deliverables, + Add a deliverable here goes to Add a deliverable to the plan, with the part already chosen. List shows the same tree, indented.

Who changes what. Whoever leads can change everything. The owner of a part can change it and everything below it. The other key people see the whole tree and who owns each part. Whoever leads without being on the list, and the rest of the organization, only see that the breakdown is in progress.

What you can do with a part. Click a part to open it:

  • Text and Save the text;
  • Owner: a key person, or No owner. The owner can be changed at any time: by whoever leads, by the owner (handing the part over) or by the owner of a part above. To give the part to someone else, add them to the list in Prepare first;
  • Indicators: up to ten per part, added with Add an indicator, each with what is measured, the Unit, the Formula, Today, Target, By (month and year), Measured (every day, every week, every two weeks, every month or every quarter), Better when it (goes up or goes down; without a choice, today and the target decide) and The number comes from: The owner reports, the default, or Y Managers calculates, only for a measure chosen from a list of what it can already count — the part's deliverables completed on time, the deliverables completed, and the execution of the part's deliverables. The written formula describes the number; it never becomes a calculation. No field is required, and what is missing shows in orange;
  • Move to: only to a part one level up;
  • Merge with: only with a part at the same level. The receiving part continues, with its owner; what was below the other one, its indicators and deliverables move to it, and the other one's text stays on record under Merged here. When merging, you choose the name that stays: one, the other, or both together;
  • Add below: a part one level down, with no owner and no indicator;
  • Add a deliverable to this part: only in a part that takes deliverables; it goes to Add a deliverable to the plan, with the part already chosen (see The plan's deliverables);
  • Delete this part of the plan…, in red, at the end of the open part: the part and everything below it leave the plan, after one confirmation. A deliverable that already exists in Y Managers isn't deleted: it stays in the day-to-day, unlinked from the plan, and in Y Managers it stays where it is. A proposed deliverable is removed.

Whoever leads can also add top-level parts, with + Add and the level's name, at the top of the map.

Undo. Above the blocks, each person undoes their own last change, including text and indicator changes, and then the one before. When someone else changed the same item afterwards, Undo refuses, so it doesn't erase their change.

The plan's indicators. In block 3, a table shows the indicators part by part — the indicator, Today → target, By and The number comes from —, and the top of the block says how many parts have an indicator. Each line opens the part: an indicator's line puts the cursor in it; for whoever can change the part, the line of a part with no indicator opens it with a new indicator, like No indicator on the map.

Nothing in the breakdown changes Y Managers: the plan goes on to approval, in step 6, and only the recording, after the plenary, takes it there (see Recording the plan in Y Managers). Without a subscription, the buttons that save show a 🔒.

The plan's deliverables

Each deliverable in the plan sits in a part of the method's last level — in CLEAR, the initiative, or the objective with no initiative below it —, in a team, and in the plan's periods the team will work on it (with the default rhythm, the quarters; see The follow-up rhythm). Deliverables come with the tree: the ones open in the Grouping components that continue from the previous year come in with the part that continues each one, and the ones from the synthesis cards come in as proposed. All of them start in the plan's first period and To confirm. Each deliverable says where it came from, in a tag and a short phrase: Existing, with came with and the Grouping component, linked by a synthesis card or brought by and the name of whoever brought it; Proposed, by Orion, from the interviews or by whoever proposed it; and New, created by and the name. The open deliverable says it in full, under Where it came from. One that already exists comes with its team in Y Managers; a proposed one starts with No team yet, and the team is chosen on its page.

The deliverables list. In block 2, right after the map, comes Add a deliverable to the plan and, below it, the list of them all, with the filters All, Existing, New and proposed and To confirm. Each line shows the deliverable, with the tag and the phrase saying where it came from; the part, which whoever can change the deliverable changes right there — to another part that takes deliverables, or to Out of the plan (day-to-day) —, confirmed or not; the team; the periods, also marked there; and the confirmation: whoever leads presses Confirm, and a confirmed one says Confirmed. Clicking the name opens the deliverable right below its line.

Add a deliverable to the plan. Choose the part under In which part — + Add a deliverable here on the map and Add a deliverable to this part in the open part already choose it and put the cursor on the name — and:

  • Create new, with just the name: the deliverable starts «to confirm», in the plan's first period, in the home team of the part's owner, and opens right away so the rest can be filled in;
  • Choose an existing one: the search by name starts at two letters and shows up to eight open deliverables of the organization, among those the person sees in Y Managers, each with where it is today (in a part of the plan, out of the plan, in a grouping or in the day-to-day), its status and its team. Bring it here puts the deliverable in the part; if it was in another part of the plan, it leaves that one, and the notice says which.

The open deliverable. Clicking a deliverable opens it below the map, when the click comes from the map or the open part, or below its line, when it comes from the list: Where it came from, its status in Y Managers (when it already exists), To confirm or Confirmed by and the name, the Team, the Periods (with the default rhythm, Quarters), the Team time in each marked period and the Part of the plan, the part it sits in. For whoever can change it:

  • Periods: one per period of the plan, to mark and unmark — with the default rhythm, T1 to T4; with another rhythm, by the months, such as Jan and Feb–May. Unmarking a period removes the deliverable's percentage in those months;
  • Change the link: to another part that takes deliverables, or Leaves the plan (stays in the day-to-day);
  • Merge with: only a new or proposed deliverable, into another deliverable of the plan. The other one continues; the name of the merged one stays on record in it, and the periods of both are added up;
  • Delete this deliverable…, in red, for a new or proposed one, which leaves the plan; or Take out of the plan…, for one that already exists, which isn't deleted from Y Managers: it stays in the day-to-day, unlinked from the plan, and in Y Managers it stays where it is.

The deliverable's page. On a new or proposed deliverable, Open the deliverable's page shows, within the planning, the Title, Team, Start, End, Periods and Description, with Back to the plan. Changing the team removes the deliverable's percentages in the teams' time. For one that already exists, the page is the one in Y Managers: Open the deliverable's page in Y Managers.

Who changes what. Deliverables follow the rule for parts: whoever leads, the part's owner and the owner of a part above it. Bringing a deliverable from another part takes being able to change both. Only whoever leads confirms: Confirm, in the list, or Confirm the deliverable, in the open deliverable; Back to «to confirm» undoes it. Every change goes into Undo, like the changes to parts.

The follow-up rhythm

Each company follows up on the plan at its own rhythm: every 2, 3, 4 or 6 months, starting in a month. The rhythm splits the plan's year into periods, and the teams' time, the Dashboard and the monthly report count by them. Without a choice, the default applies: every 3 months, starting in January — the usual four quarters, and the stage says Quarter 1 and T1, as before. The rhythm shows at the top of block 4, for example Rhythm: every 4 months, starting in October; whoever coordinates the planning changes it with change (the Admin too, when they are one of the key people), which opens the The follow-up rhythm dialog: How often?, One of the periods starts in and a preview of how the year's plan looks. The rhythm applies to the whole organization and carries over from one year to the next. After the recording, it also appears at the top of the Plan reviews step, with change for the coordinator and for the Admin (see The plan reviews).

The periods are cut at the plan's start and on December 31. Every 4 months starting in October, for example, a full-year plan has Jan, Feb–May, Jun–Sep and Oct–Dec: Jan is the end of the October-to-January period, which started the year before, and Oct–Dec is the start of the next period, whose rest goes into the next year's planning; the note below the tabs says so, for each piece. Changing the rhythm deletes nothing: each percentage holds for the months it was given for, and a new period shows the average of those months, weighted by the hours.

Each team's time, period by period

In block 4, the planning shows each team's time, one period at a time — with the default rhythm, Quarter 1 to Quarter 4; with another rhythm, by the months, such as Jan and Feb–May; a period that goes over 100% is flagged on its tab. Each team's manager splits the team's time in percentages, by priority, among the deliverables the team will work on in the period, with no need to know how many hours the team has: Orion turns each percentage into hours (the percentage times the team's time). Whoever leads and the manager of a team above can also fill it in; the other key people see the numbers. A manager who isn't on the key-people list doesn't see the breakdown: to fill it in, they first join the list in Prepare. A percentage is saved when leaving the field; empty means «no percentage».

Each team has a card with:

  • the manager, or No manager on record, and the team's hours in the period: for each person whose home team it is, the country's working days in the period, minus holidays, times the weekly hours in their profile (with no hours on record, 8 hours a day). Each person counts once, in their home team, and only people count. It is the same calculation as the work plan;
  • the day-to-day: the part of the time that doesn't go to deliverables, such as support, managing the team and training. In the plan's first period (with the default rhythm, Quarter 1), it is Day-to-day, from the signed plans: what those plans already take, with no field to change, and the deliverables from the previous year show already in the plans with the hours, without a percentage. From the second period on there are no work plans yet: the day-to-day starts at the previous year's average — the hours of lines without a deliverable and of recurring deliverables, over the hours of the plans signed that year —, and the manager adjusts it period by period. A team with no history starts at 0%, with a notice;
  • a percentage for each of the team's deliverables marked in the period;
  • the total, and Free or Over 100%, in percentage and in hours. Over 100%, the card names the heaviest deliverables and suggests lowering a percentage or moving a deliverable to another period, in the deliverables list.

The notes say what makes the number optimistic: whoever has no signed work plan in the first period counts as free, and a deliverable without a percentage doesn't add to the total. A new or proposed deliverable with no team stays out of the cards until it gets one, on its page; a notice at the top counts how many are missing. Absences and vacations aren't in the count yet. Where the numbers come from, at the end, repeats these calculations.

Like the rest of the breakdown, nothing about the time is saved to Y Managers before approval.

The approval and the plenary

With the breakdown ready, whoever coordinates takes the plan to approval (the Take the plan to approval card, below the tree, first says what to check, without blocking). Step 6, Approval and plan, starts, and each owner gets a personal notice with the parts waiting for them.

1. Each owner approves their part. Approving a part (objective or initiative) means approving its text, owner, indicators and deliverables; without an indicator, it is tracked by the execution of its deliverables. It's decided by the owner, the owner of a part above it, whoever is above them in the team line and whoever coordinates — each person only sees the buttons of what they decide. Approve takes an optional comment; Reopen the discussion withdraws the approval and notifies the owner; editing an approved part withdraws it too. Reject… (only a part not yet approved, with a confirmation) takes the part out of the plan with what is below it; deliverables that already exist in Y Managers stay in day-to-day work. The rejected part goes to The rejected parts, from where Bring back for discussion returns it, without the earlier approvals.

2. What each person approved
who approved each part, when and the comment.

3. The plenary validates the whole. With everything approved, the key people discuss the plan and whoever coordinates records: Approved as is, Approved with adjustments or Back to review (which reopens every part). Once approved, the plan locks until it's recorded; whoever coordinates can Reopen the plan. Each key person is notified of the result.

With the plan approved, whoever coordinates records it in Y Managers (see Recording the plan in Y Managers). Notices go to each person, never to a group; without a subscription, the buttons show a 🔒.

Recording the plan in Y Managers

After the plenary approves the plan, whoever coordinates takes it to Y Managers, in step 3 of stage 6, in the Record the plan in Y Managers block. When recording «approved as is» or «approved with adjustments» with nothing blocking the recording, the button is Record the result and the plan in Y Managers: it records the result and the plan at once. A plan that is already approved has the Record the plan in Y Managers button. Before that, a confirmation says what is going to happen.

What recording does. Each objective and each initiative of the plan becomes a group on the Grouping page, or updates the one that already exists when the part came from the previous year, with the part's name, the type of the method's level (in CLEAR, Objective and Initiative), the part above it and the owner. A deliverable that already exists moves to another group when the plan moved it. A new deliverable is born in its team, as Not started, with the dates on its page; without dates, what the marked periods cover applies, from the first day of the first month to the last day of the last one. A new day-to-day deliverable is born without a group.

What recording doesn't do. Nothing is deleted or deactivated. Whatever stayed out of the plan remains as it is in Y Managers: the groups no card brought in, the rejected parts and the day-to-day deliverables. The indicators and each team's time stay in the planning.

What blocks it. A new deliverable still To confirm; a new deliverable without a team, without dates and without marked periods, or with reversed dates; a part without a title. The list shows in the recording block. Whoever coordinates confirms each deliverable To confirm right there, also with the plan approved. To give a team or dates, or to take a deliverable out, whoever coordinates reopens the plan.

Afterwards. The block says Recorded in Y Managers, with the date and who recorded it, what was done and links to Grouping and to the deliverables, and stage 6 shows as «Done». There is no Undo of what came before the recording. To change the plan, whoever coordinates reopens it; once the plenary approves again, recording updates the same groups and deliverables, without duplicates. Orion lets the key people and the managers of the teams that got new deliverables know, each one through their personal notice (the bell, the person's own Orion WhatsApp and email), never in a group.

The plan on the dashboard

After recording, the plan shows up on the Dashboard, in a section named after the plan's year (for example, The 2027 plan), for whoever the organization lets see the Dashboard. At the top, a summary of the whole plan: the execution, the indicators counted by status and the time of the current period. Each objective and each initiative carries three numbers: deliverable execution (of what the part's deliverables should have advanced by today, how much they did), time for the current period, at the company's rhythm (the planned hours, from each team's percentage, and the applied hours, those of the work plans signed in the period) and the indicators, with the number, the target and the status: On track, Watch or Off track. A part without an indicator is tracked by deliverable execution. The indicators Y Managers calculates already have a number; the ones the owner reports show the last number entered, with its period (for example, “13 clients in Apr”). The The dashboard chapter explains each number.

The owner's number. In See details, each indicator the owner reports shows the numbers period by period, with each one's status color, and who entered the last one. The part's owner and the Admin enter the number right there, in Enter the number: choose the period (for a daily indicator, the day) and type just the number, without the unit; Save records it. Saving again in the same period corrects the number, and Delete the … number removes it. Everyone else sees the numbers, without the field; someone the organization hasn't let see the Dashboard doesn't see this section, and in that case replies to Orion in the conversation, or the Admin enters the number. A period's number counts at the end of it; the current period's number counts as “so far”. When the “Today” was missing in the planning, the number of the earliest period entered becomes the baseline, and the status is measured from it. A period that ends without a number says “no number” after 3 business days, and the indicator then says “no number since …” instead of the status. The year's last period (December, the 4th quarter, the last fortnight or the last week) has that deadline too: in January, until the 4th business day, the Dashboard also shows the plan that ended, just to close the numbers, and then it leaves the Dashboard. For a daily indicator, the status counts by week, with the week's last number. The number is entered in this section of the Dashboard or by replying to Orion in the conversation.

Orion asks for the number. On the first business day after each period ends, Orion asks the owner for the numbers they report, in a single message with all the missing ones. The question goes to the owner's conversation with Orion, on WhatsApp or Telegram; whoever has neither gets the notice in the bell and by email, with the link to the Dashboard, and Orion's first reply in the chat on the site or in the app after that ends with the numbers still missing. Just reply with the number: Orion checks which indicator and period it is for, records it and says what it recorded, and the Dashboard shows the number as entered through the conversation. For daily and weekly indicators, the question comes at most once a week, on Monday, for the week that ended. Without an answer, Orion reminds once, on the day the period starts saying “no number”; the number can still be entered on the Dashboard. When an indicator is Off track in two periods in a row (for daily and weekly indicators, in two weeks in a row), Orion notifies the part's owner and the owner of the part above it in the plan tree; at the top, whoever coordinates the planning. None of this goes to groups. The indicators that Y Managers calculates are not asked for: on the day after each period ends, Y Managers keeps their number, and See details also shows their numbers period by period.

The plan in the monthly report. The organization's monthly report, on the Reports page, comes out on the 5th business day of each month and has the plan section: the plan as it stood on the last day of the month, with deliverable execution, the indicators by status, the parts and what needs attention; in the months when a period of the plan ends (with the default rhythm, March, June, September and December), also that period's planned and applied time. A team's report has only the parts where the team has deliverables, and execution counts only its deliverables.

Plans from previous years. When the year ends, its plan also stays on this page, read-only, and remains here after it leaves the Dashboard. The year list at the top of the page shows, before the current year, the years that ended with a recorded plan, with «ended» in the name (for example, 2026 · ended). When one of them is chosen, the page shows the plan the way the Dashboard did: the summary, the parts and each part's numbers, with the notice that it ended on December 31, and without the planning steps. Nobody enters numbers there; in January, while the plan that ended is still on the Dashboard, the last period's number is entered there. The Dashboard's rules apply: someone the organization hasn't let see the Dashboard doesn't see these years in the list, and, with Team-level privacy switched on, someone with the User profile sees only the parts where their teams have deliverables.

The plan reviews

Every period of the company's rhythm, the recorded plan goes through a review: whoever leads stops, looks at the results and decides what changes for the next period. Y Managers already tracks the deliverables and the teams' time on its own, and Orion gathers that in the review; people keep what only they know and decide. It is the page's seventh step, Plan reviews, which appears after the recording in Y Managers and becomes the current step. Its legend shows the rhythm, for example every 4 months, and the rhythm also appears at the top of the step, with change for the coordinator and for the Admin.

When the review opens. It opens two weeks before each period ends and stays open until the 5th business day of the next period. With the default rhythm, the Q1 review opens on March 18 and stays open until the 5th business day of April. The review of a period that crosses the year end belongs to the plan of the year in which it ends, and looks at the piece inside that plan: every 4 months starting in October, the October-to-January review belongs to the plan of January's year. Changing the rhythm while a review is open does not change that review: the change applies from the next one. When the review opens, Orion tells the coordinator and the key people, in each one's conversation (whoever has neither WhatsApp nor Telegram with Orion gets the notice in the bell and by email), and reminds once, 3 business days later, whoever still has something to do.

What the review shows. At the top, the period, until when it stays open, who coordinates and the 4 steps, each with its status; Your next step says what is missing. Then come four blocks:

  1. The results of the period, read-only: the execution of the plan's deliverables, the indicators counted by status, the plan's deliverables in the period (completed, late and in progress), the teams' time (the hours applied, from the signed work plans, over the planned ones) and What needs a decision, the parts Orion picked out.
  2. The period's numbers: one row per indicator and one column per month of the period, with the last month highlighted. The indicators Y Managers calculates update themselves. In the ones the owner enters, the number still missing for the last month has a field right there, for the part's owner and for the Admin, and Save the numbers records them all at once; the number can also come through the conversation with Orion. To change a target, choose Adjust on its part.
  3. What to do with each part: one decision for each part of the plan. Keep: stays as it is. Adjust: changes the target, the deadline, the owner or the deliverables. Pause: out of focus until the next review, and the deliverables stay in Y Managers. Close: done or set aside, it leaves the Dashboard at the end of the period. Orion suggests one, with the reason, by a fixed rule on the numbers: close, when all the part's deliverables are completed and no indicator is off track or needing attention; pause, when there is a late deliverable and no hours were applied to the part's deliverables in the period's last month; adjust, when an indicator is off track; and keep, otherwise. Adjust opens the target and the "by when" of each of the part's indicators, and the owner; to add or remove deliverables, the way is the Breakdown. Each decision takes a reason, which goes in the record.
  4. The priorities for the next period: up to 3 parts where the company concentrates its effort. Those of the previous review continue, as "reinforced", unless someone removes them with Stop being a priority; a paused or closed part leaves the priorities. The same block holds the leadership's message, optional.

Who does what. The review belongs to the key people. Each part is decided by its owner, by the planning's coordinator or by whoever is above the coordinator in the same team line (the manager of the coordinator's team and those of the teams above it). The priorities, the message and the closing are up to the coordinator or to whoever is above them. Whoever is above and is not a key person joins the Prepare list first. Whoever is not a key person sees only the progress in the step: the rhythm, the year's reviews and when each one opens.

Closing the review. Close the review, in the bar at the bottom, asks for a confirmation. It can be closed with something missing: whatever is missing stays in the record as "no number" or "no decision". When it closes:

  • the target, the "by when" and the owner of the adjusted parts change in the plan, and the owner also changes in Y Managers' Grouping;
  • a paused part leaves the Dashboard and the priorities until the next review closes, and Orion does not ask for its numbers in that time;
  • a closed part leaves the plan at the end of the period, with the parts below it, and the deliverables stay in Y Managers;
  • Orion takes the priorities and the message to the key people and to the managers of the teams with deliverables in the plan, in each one's conversation.

The review record. The closed review becomes the record: the summary, the period's numbers, the decisions part by part, what changed in the plan, the priorities (the new ones, the reinforced ones and those that left, with who removed them), the message and who took part. See what the record will look like, in the bar, shows the preview before closing. The record stays in this step, in The … reviews, with See the record; the priorities and the message appear at the top of the plan section in the Dashboard; and the organization's monthly report for the month in which the review closed brings the review.

Between one review and the next. The step shows the next review and when it opens, what applies now (the priorities, the message and the paused parts from the last review) and the year's reviews, with each one's record. The review of the period that ends on December 31 is the year-end review: it closes the results and the numbers, without the decision on each part or the priorities, because what stays and what changes in the next year is the next year's planning. The records of a year that ended stay on that year's page.

The planning path, in the conversation

Orion also knows the annual planning as a path: the step-by-step of a company process that it conducts. Ask in the conversation, for example "how do I plan the year?" or "let's plan 2027", and Orion explains, in your language, the stages, who decides each one, the most common pitfalls, a calendar to start January with the plan recorded and where to start. The path goes beyond the page: after the recording, it reaches each team's deliverables plans and work plans, in Y Managers. Starting the planning is still up to the Admin, on the page.